|
|
The newly joined centre and forward fuselage sections revealed after the tent is removed |
The rear fuselage is lifted into position prior to being re-joined |
|
|
The two fuselage sections waiting to be riveted together
|
The
rear fuselage aligned and ready to be re-joined |
|
|
The
painted and re-joined rear fuselage |
The hiab crane prepares to lift the right outer wing |
|
|
The
right outer wing is lifted and aligned |
The first of over 600 bolts (300 or so per wing) are fitted |
|
|
The left outer wing is lifted |
Bolt fitting commences on the underside of the left outer wing |
|
|
The left outer wing |
Delta Golf's wingspan back to full length |