Spirit of brooklands
CONCORDE
LOGO
 
Restoration Diary
3rd March 2005 - the 5 main sections are moved into position
Page 1  |  Page 2
IMG_0557.JPG
The wing jig can be seen here
IMG_0561.JPG
Left wing time!
IMG_0565.JPG
As the jig for the left wing, is currently holding the right wing, it will sit initially on pallets
IMG_0566.JPG
lowering onto pallets
IMG_0573.JPG
Nearly down!
IMG_0582.JPG
2nd last step of the day was to place the rear fuselage onto some railway sleepers
IMG_0589.JPG
once the forward fuselage is in place, its jig will be used to position the rear section
IMG_0595.JPG
back onto the tressles
IMG_0600.JPG
A little lop-sided, but no big deal at present
IMG_0601.JPG
The right wing is step closer to the fusleage
IMG_0604.JPG
Final job was to move the forward fuselage round from the hangar
IMG_0606.JPG
A little helping hand
IMG_0615.JPG
The forklift was used to get it roughly in the right position
IMG_0618.JPG
Final positioning
IMG_0621.JPG
in place...for now
IMG_0630.JPG
At the end of the day
IMG_0632.JPG
At the end of the day
IMG_0634.JPG
At the end of the day from the VC 10