3rd March 2005 - the 5 main sections are moved into position
Page 1  |  Page 2
IMG_0469.JPG
The smaller crane is readied for first lift of the day
IMG_0471.JPG
Up goes the tail section
IMG_0476.JPG
Tail section loaded onto ASI's flatbed
IMG_0478.JPG
Lowering down
IMG_0481.JPG
Positioning the lifting gear on the forward fuselage
IMG_0483.JPG
Forward fuselage lifted
IMG_0487.JPG
lowered to special jog
IMG_0497.JPG
lowered to special jig
IMG_0499.JPG
Strapping down the fuselage
IMG_0504.JPG
The forward fuselage was left in front of the hangar till the end of the day
IMG_0509.JPG
Now onto the centre section....
IMG_0517.JPG
2 cranes were used here
IMG_0523.JPG
lifting it up from its present position
IMG_0529.JPG
The special forward cradle was used again
IMG_0531.JPG
lowering down to the jacks again, but this time in the centre of the road.
IMG_0536.JPG
next was the right wing
IMG_0544.JPG
It was lifted up to allow it to be worked on
IMG_0552.JPG
it was placed on a purpose built jig that will allow it to be positioned easily to the correct place