The smaller crane is readied for first lift of the day
|
Up goes the tail section
|
Tail section loaded onto ASI's flatbed
|
Lowering down
|
Positioning the lifting gear on the forward fuselage
|
Forward fuselage lifted
|
lowered to special jog
|
lowered to special jig
|
Strapping down the fuselage
|
The forward fuselage was left in front of the hangar till the end of the day
|
Now onto the centre section....
|
2 cranes were used here
|
lifting it up from its present position
|
The special forward cradle was used again
|
lowering down to the jacks again, but this time in the centre of the road.
|
next was the right wing
|
It was lifted up to allow it to be worked on
|
it was placed on a purpose built jig that will allow it to be positioned easily to the correct place
|