7th-10th March 2005 - The temporary tent is erected
IMG_0642.JPG
With another crane on site the "A" frames are all ready to lift into position
IMG_0644.JPG
First one goes in
IMG_0646.JPG
2nd one allowed the structure to be Squared off
IMG_0647.JPG
From the other end
IMG_0649.JPG
Lifting the simulator over the phone cables and into position "inside" the tent
IMG_0651.JPG
With 5 sections in place from one end, the next 4 were lifted from the rear
IMG_0653.JPG
Final section lifted into place
IMG_0658.JPG
The frame work complete
IMG_0660.JPG
Next job is to put the cover on
IMG_0672.JPG
The simulator in the corner that will house the display area and temp displays
IMG_0673.JPG
The main roof covers are pulled over section at a time
IMG_0674.JPG
ASI re-position the forward fuselage, it had been moved to allow access for the Majestic marquees
IMG_0675.JPG
The roof completely on
IMG_0685.JPG
By the end of the day the side panels had been fully fitted
IMG_0701.JPG
Final stage will be to fit the end panels and doors.
IMG_0706.JPG
The display area can be seen to the right of the aircraft.