With another crane on site the "A" frames are all ready to lift into position
|
First one goes in
|
2nd one allowed the structure to be Squared off
|
From the other end
|
Lifting the simulator over the phone cables and into position "inside" the tent
|
With 5 sections in place from one end, the next 4 were lifted from the rear
|
Final section lifted into place
|
The frame work complete
|
Next job is to put the cover on
|
The simulator in the corner that will house the display area and temp displays
|
The main roof covers are pulled over section at a time
|
ASI re-position the forward fuselage, it had been moved to allow access for the Majestic marquees
|
The roof completely on
|
By the end of the day the side panels had been fully fitted
|
Final stage will be to fit the end panels and doors.
|
The display area can be seen to the right of the aircraft.
|